You are here: Sanfeng Xiaosong » Blog » Intelli beverage depot » Sanfeng Xiaosong’s Oversea Porject in Malaysia

Sanfeng Xiaosong’s Oversea Porject in Malaysia

Views: 1000     Author: SanFeng XiaoSong     Publish Time: 2025-03-27      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button


Hubei Sanfeng Xiaosong Advances Vital Health's Automated Warehouse Project 


In the rapidly evolving global logistics industry, automation and intelligence have become key to enhancing warehouse efficiency. As a world-leading provider of intelligent warehousing solutions,  Sanfeng Xiaosong Logistics is steadily advancing the Vital Health's Automated Warehouse project. With precise project planning and efficient execution, each key phase is progressing smoothly, moving towards full-scale intelligent warehousing.


836b7b8c9ae56ecc871aac4dbf59106




Meticulous Execution: Step-by-Step Progress

Since the arrival of storage racks on-site, the project construction team has strictly adhered to standardized procedures, ensuring seamless integration from structural installation to automated deployment. The latest construction progress includes:

High-Bay Racking Installation Process

  1. Component Inspection: Before installation, all components undergo a comprehensive inspection to ensure they are free from damage or deformation. Any deformed parts are corrected to maintain installation accuracy and safety.

  2. Assembly of Upright Frames: Column assemblies are pre-assembled on wooden platforms to prevent scratches on the coated surfaces and ensure structural integrity.

  3. Lifting Method: Depending on site conditions, suitable lifting methods such as cranes, hoists, or manual handling are selected to ensure safe and efficient installation.

  4. Installation Sequence:

    • Erect upright frames and secure them in place;

    • Install horizontal beams, back braces, and horizontal braces to form a complete structural framework;

    • Use precision measuring tools to adjust vertical and horizontal alignment to ensure accurate positioning.

  5. Base Plate Fixation: Once the rack framework meets design specifications, base plates are fixed, and all connecting bolts are tightened to ensure overall stability.

  6. Overhead and Floor Rail Installation:

    • Pre-installation alignment correction ensures minimal deviation within the standard range;

    • Rails are then welded and polished to ensure smooth, unobstructed operation of high-speed stacker cranes.

  7. Quality Inspection: Upon completion, a comprehensive inspection is conducted, including load testing, structural stability verification, and level alignment checks to ensure compliance with design standards.




Project Highlights: Innovation and Precision Combined

This high-density automated warehousing project features multiple technological innovations, setting a new benchmark for warehouse automation in Malaysia:

  1. Optimized High-Density Storage: The Automated Storage & Retrieval System (AS/RS) significantly enhances storage space utilization, minimizes land use, and improves inventory management efficiency.

  2. Automated AS/RS System: High-performance stacker cranes enable fast and precise material handling, ensuring seamless goods movement.

  3. Smart Warehouse Management System (WMS): The integration of an intelligent WMS enables real-time inventory monitoring, automatic replenishment, and precise inventory control.

  4. Precision Engineering for Long-Term Stability: Every phase, from rack installation to rail alignment, adheres to millimeter-level construction standards, ensuring long-term operational stability.

  5. Efficient Coordination for Timely Delivery: From material arrival to equipment installation, the Mach Sanfeng Xiaosong team ensures meticulous planning and execution, keeping the project on track for scheduled delivery.



Next Phase: Transition to Full Automation

With the structural setup nearing completion, the project is set to enter the key automation deployment phase, which includes:

  • Installation of High-Speed Stacker Cranes: Efficient and intelligent stacker cranes will be installed and fine-tuned for optimal performance.

  • WMS & WCS System Integration: The warehouse management and control systems will be seamlessly linked to ensure intelligent inventory and inbound/outbound logistics management.

  • Final Testing & Trial Operation: Multiple rounds of functional testing will be conducted to ensure the entire system reaches its optimal working condition before full-scale operation.



Leading Malaysia into a New Era of Smart Warehousing

The completion of the Vital Health Automated Warehouse will set a new standard for modern logistics in Malaysia, significantly enhancing operational efficiency and cost control while serving as a key reference for warehouse automation across Southeast Asia.

Mach Sanfeng Xiaosong Logistics remains committed to delivering world-class intelligent warehousing solutions, leveraging exceptional technology and engineering expertise to drive logistics transformation. Stay tuned for our latest updates and witness the emergence of an industry benchmark!





FAQ

  • What is the purpose of the Vital Health automated warehouse project?

    • The project aims to enhance storage efficiency, optimize inventory management, and automate material handling using an advanced AS/RS system.


  • What are the key phases of the warehouse installation process?

    • The installation includes component inspection, rack assembly, structured lifting and installation, track alignment, and final quality inspection to ensure stability and precision.


  • What automation technologies are being implemented in this warehouse?

    • The project integrates high-speed stacker cranes, an automated storage and retrieval system (AS/RS), and a smart warehouse management system (WMS) for real-time inventory tracking.


  • How does this automated warehouse improve operational efficiency?

    • It reduces manual labor, minimizes storage space requirements, increases material handling speed, and ensures precise inventory control through intelligent system integration.


  • What measures are taken to ensure the long-term stability of the warehouse system?

    • The construction follows millimeter-level precision standards, with rigorous quality inspections, durable materials, and seamless system integration for sustained performance.


  • How can businesses benefit from similar intelligent warehousing solutions?

    • Companies can achieve cost savings, improve logistics efficiency, reduce human errors, and enhance overall supply chain performance with tailored automation solutions.




Limited-Time Free Consultation – Unlock Your Smart Warehousing Potential!


Contact Senior Technical Consultant Mr. Ji at +86 18675533143 to get your customized smart warehousing solution today!




942002ee86d345b55182463a3fe6871


3 CONTACT US
Add : No. 98, Pengcheng Road, Huangjinshan Industrial Zone, Huangshi City, Hubei Province,China 
P.C. : 435000
Tel : +86-15986750334
E-mail : info@io-sfxs.com
ConTACT with us


If you need more information about Sanfeng or wish to further discuss business opportunities with us

China Offices

No. 98, Pengcheng Road, Huangjinshan Industrial Zone, Huangshi City, Hubei Province  P.C.: 435000

Malaysia Offices

No 2, Jalan Idaman A, 81400, Senai, Johor, Malaysia

E-mail

info@io-sfxs.com

Hubei SanfengXiaosong Logistics Technology isn't just an equipment supplier for intelligent warehousing systems; 
we are also a dedicated comprehensive service provider in the field of smart warehousing solutions.Our scope of services includes solution design, equipment manufacturing, system integration, and continuous service support
NAVIGATION
ABOUT US
FOLLOW US
PRODUCTS
STORE INFORMATION
Copyright © SanFeng XiaoSong Group